ABSTRACT The determination of the phase shift and the light shift in our optically pumped Cs beam is reported here. We show that an error on the phase difference value determined by our fit method, without beam reversal, can be induced if the light shift is not taken into account. If the experimental data are corrected for the light shift, the results of the fit method are in very good agreement with the beam reversal results. This allows us to reduce the related uncertainty in the accuracy budget of our standard. The resulting overall accuracy of the standard is now estimated to be 6.3 x 10-15.
© 2000, by The Institute of Electrical and Electronics Engineers, Inc. All rights reserved.